sheet P6 — general arrangement

The whole
development,
drawn to scale.

Cellect gives real-estate developers one sheet for the whole project: the scheme drawn to scale, the cost plan dimensioned against it, and every revision kept in the margin.

project
Harlow Yards
site area
1,920 m²
gross floor area
4,838 m²
units
48
plate A/1 — site plan1:200
ENTRYBLOCK A · 6 LEVELS · 48 FLATSAAT1 STREET TREE ×7T2 RETAINED ×3T3 MULTI-STEM ×416.0038.405.6060.0032.004.0021.007.00N01
site 1,920 m²footprint 806 m²coverage 42%rev C

Forty-eight flats, a stair core and a raft.

Drawn at scale, dimensioned, and carrying the three marks the key below reads back.

plate A/2 — typical floor plan · levels 1–61:100
ABCDEF123A177.8 m²A277.8 m²A377.8 m²A477.8 m²B177.8 m²B277.8 m²B377.8 m²B477.8 m²STAIRLIFTLOBBYLIFTRISERREFUSECORRIDOR 1.806.008.108.108.108.1038.409.601.809.6021.00N02
8 flats per leveltype A 77.8 m²corridor 1.80 mnet to gross 77%
plate A/3 — section A–A1:100
ABCDEF±0.000L1+3.100L2+6.200L3+9.300L4+12.400L5+15.500L6+18.600ROOF3.103.103.103.103.103.1019.40PARAPET 0.80RAFT 1.00 — RE-PRICED AT REV B, $67,75003
6 levels at 3.10 mparapet +19.400gfa 4,838 m²48 flats

Key to the drawing

3 marks · plates A/1–A/3 · details at plate scale

FeasibilityPlate A/1 — west boundary
Test massing, mix and money against live cost data before the site owns you. This one carries 1,920 m² at 42% coverage.
DeliveryPlate A/2 — unit type A2
Every instruction, change order and approval is pinned to the element it moved, so the cost plan and the drawing never describe different buildings. All 8 flats on a floor, priced as drawn.
HandoverPlate A/3 — roof at +18.600
Handover that isn’t a cliff. The asset’s whole story arrives on day one: systems, warranties, and what to watch.

The drawing says how it works. The ledger says what it costs.

One element per line, priced against the plates, with the one line that has gone past its budget shown for exactly how far.

plate B — cost plan · rev C2026-09-03
Elementbudget → committedRemaining
Site & acquisition$4,200,000 $4,200,000$0
Demolition & enabling$610,000 $588,400$21,600
Substructurepast budget $67,750 · 3.7%$1,845,000 $1,912,750−$67,750
Superstructure$6,930,000 $5,204,300$1,725,700
Envelope & roofing$2,415,000 $1,806,000$609,000
Fit-out & finishes$3,180,000 $942,500$2,237,500
External works & planting$745,000 $118,900$626,100
Fees & contingency$1,925,000 $1,140,600$784,400
Total$21,850,000 $15,913,450$5,936,550
committedbudget remainingpast budgetbars share one scale · longest track = $6,930,000
committed 72.8% of budget$4,516 per m² over 4,838 m² gfaremaining $5,936,550

Nothing changes without a mark

3 issues · current rev C · 2026-09-03

RevDateDescription
C2026-09-03Fit-out packages released for tender; commitment held pending returns.issued by CE
B2026-07-30Substructure re-priced after the ground survey. The $67,750 overrun is carried against contingency.issued by DM
A2026-06-12Cost plan issued from the feasibility model at RIBA stage 2.issued by CE